- LIN
SUPPLY
-
NITROGEN PURGING CONTRACTS
-
NITROGEN GAS PURGING SKIDS -
-
HYDROGEN SKIDS – NEW PHOTOS
-
CYLINDER BANKS
|
Quick
Search for : |
|
| |
|
Super
Insulated Vacuum Piping Vacuum
, Cleaning & Testing |
| To be able to
pull a good vacuum level the piping has to clean
and free from all traces of grease, dirt and any
other impurities. Anything less will result in
outgassing and an inability to maintain a high
level of vacuum. The result of loss of vacuum
or poor vacuum levels are sweating on the outside
of the pipe line. |
|
|
|
All components
of a Cryofin Vacuum Insulated line are cleaned
thoroughly before assembly and no Vacuum Insulated
Pipe spool leaves our factory without a retention
test to confirm the vacuum level is holding. All
of these procedures are part of our quality system
and each Super Insulated Vacuum Line manufactured
is issued with an ITP and we welcome our customers
to be involved in our quality system and where
possible become signatories to important hold
points during manufacture, it provides confidence
all round. We can include hydrostatic tests, cold
shock (LIN) tests, retention tests other than
7 days, pneumatic helium leak tests, any tests
you as a customer requests. |
|
|
|